Steel railway bridge covering with polyurea
Steel railway bridge covering with polyurea
Recently, Polimaris led a project in Klaipeda. This object is a great example of great material, its features and capabilities. The task was a 200 m2 steel railway bridge, which had to be covered with a polyurea with a protective layer more than 5 mm thick. The work was done in two days, with preparatory work. The steel bridge goes into a tougher climate zone and starts to serve the Norwegian infrastructure.